...
Excerpt | ||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Cloud Migration Assistant
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
|Since 3.2233.1-ENTERPRISE.|
Tip |
---|
Migration of BPMN Modeler Enterprise diagrams can now be completed with one click, by automatically migrating links (to other diagrams or Confluence pages/attachments) in Confluence cloud. To be able to perform the below guide, please upgrade to BPMN-3.22.1-ENTERPRISE the newest BPMN Modeler ENTERPRISE version before migration. |
In order to migrate your BPMN Modeler Free / Enterprise diagrams to a Confluence Cloud instance, please follow these steps:
Install the latest version of BPMN Modeler Enterprise (>= 3.22.1-ENTERPRISE)
In case you are using the BPMN Modeler Free, get a free trial version of the BPMN Modeler Enterprise at no cost. Since February 2023 Atlassian does not issue new licenses, even trial licenses for Server Apps. You can simply download and install the BPMN Modeler Enterprise for Confluence Data Center as a trial: https://marketplace.atlassian.com/apps/1219284/bpmn-modeler-enterprise?hosting=datacenter&tab=overview
BPMN Modeler Free and Enterprise versions can be installed in parallel. So uninstalling your BPMN Modeler Free beforehand is not required
As Confluence administrator, perform the Upgrade procedure to make sure all of your diagrams are upgraded to ENTERPRISE, as described here: [BPMN Modeler] Features for Confluence Admins Usage Analysis and Upgrade of Existing Diagrams
We recommend doing this even if you are already using BPMN Modeler Enterprise. Maybe some old FREE diagrams are hiding somewhere from earlier days!
After completing the upgrade procedure, it is necessary to perform a Rere-Indexing indexing of your Confluence pages
After Re-Indexing completion, verify that there do not exist any more FREE diagrams in your Confluence by performing the Analysis again
Go to the App Configuration of BPMN Modeler Enterprise. Find the tab Cloud Migration and trigger the export of page data. Keep this file in a place where you will find it again.
Migrate your pages to Confluence Cloud. Please make sure to carry over all your page attachments for the BPMN diagrams . All ENTERPRISE diagrams (page macros) will be recognized seamlessly after installing the BPMN Modeler Enterprise Cloud app.
In Confluence Cloud: Check if your new pages and attachments are indexed correctly (e.g. by using the Confluence search to find a migrated page). If not, request a re-indexing with Atlassian support.
To synchronize BPMN or DMN diagram links, Confluence page links, Confluence attachment links, external content links (web URLs) or Jira links, navigate to Manage apps > Configure BPMN Modeler Enterprise. Find the tab Cloud Migration and import page data by uploading the file you downloaded in step 4. After the link migration is done, you will either get a success message or a warning message with detailed information for every single link migration that has failed so that you might migrate these links by hand if necessary. Links are migrated as follows:
BPMN or DMN diagram links will work the same way as they did on your OnPremise Confluence instance.
Confluence page links will be migrated seamlessly and will link to the corresponding migrated Confluence Cloud page.
Confluence attachment links will also link to the corresponding migrated attachment in your Confluence Cloud instance. Unfortunately, due to technical reasons if two attachment with the same name exist in one Confluence space, it can not be uniquely determined to which one of the two a link must be set. Thus, the link must be reset manually if necessary and will be logged in the warning message after the import is completed.
External content links (web URLs) will stay the same way as in your OnPremise instance with one exception: If Confluence page links were not set using the Confluence page link feature but instead have been copied and pasted as URLs into the external content link feature by your users, our migration tool will detect this. It will then reset the URL which previously linked to a Confluence OnPremise instance to your Confluence Cloud instance so that the link is not broken or outdated after the migration.
The Jira link feature is not available at this point in Confluence Cloud due to technical reasons. We thus reset all Jira links as external content links (web URLs) so that your Jira links are not lost. Please note, that web links will link to the Jira instance which was connected to your Confluence OnPremise instance.
Now, please synchronize all diagram links so that they can be displayed correctly for example in the [BPMN Modeler] Process Net. The sychronization process is described on the page [BPMN Modeler] Features for Confluence Admins.
If you used to restrict our tool to certain Confluence spaces or would like to do so now, please follow the instructions detailed on [BPMN Modeler] Features for Confluence Admins to (re-)configure spaces whitelisted for usage.
Done. All your BPMN diagrams with all of their links are ready to use.
Happy modeling!
Note |
---|
IMPORTANT: All files and pages must be indexed by Confluence after the migration so that the links can successfully be migrated. If the Confluence search does not find certain files, links to these files will fail to be migrated. You can request a reindexing re-indexing of your Confluence Cloud instance with Atlassian. |
...